翻訳と辞書
Words near each other
・ Ngai (surname)
・ Ngai Jong
・ Ngai Shiu-kit
・ Ngai Tahu Claims Settlement Act 1998
・ Ngai Tupa
・ Ngai-Ling Sum
・ Ngaiire
・ Ngain Nghon
・ Ngaing language
・ Ngainga
・ Ngaio
・ Ngaio Bealum
・ Ngaio Marsh
・ Ngaio Marsh Award
・ Ngaio Marsh Theatre
Ngaio Railway Station
・ Ngaio, New Zealand
・ Ngairangbam Bijoy Singh
・ Ngaire
・ Ngaire (album)
・ Ngaire Fuata
・ Ngaire Lane
・ Ngaire Smith
・ Ngaire Thomas
・ Ngaire Woods
・ Ngairea
・ Ngairea murphyi
・ Ngaizawl
・ Ngaizun
・ Ngajat


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Ngaio Railway Station : ウィキペディア英語版
Ngaio Railway Station

|}
Ngaio Railway Station is one of eight railway stations on the Johnsonville Branch, a commuter branch railway north of Wellington in New Zealand’s North Island, and serves the suburb of Ngaio. The station was erected and operated by the Wellington and Manawatu Railway Company (WMR) on their line from Wellington to Longburn. The area served by this station used to be called Crofton, until the suburb was renamed to Ngaio in 1908. From the acquisition of the WMR by the New Zealand Railways Department in 1908 until the opening of the Tawa Flat deviation in 1937, the station was on the North Island Main Trunk Railway. On 2 July 1938 the truncated section of the line to Johnsonville became the Johnsonville Branch.
Matangi electric multiple unit trains are operated by Tranz Metro under the Metlink brand through this station in both directions to Johnsonville (to the north) and Wellington (to the south).
== History ==
Ngaio was one of three stations constructed by the Wellington and Manawatu Railway Company on what is now known as the Johnsonville Branch. It was opened on 21 September 1885 along with the first section of the company’s line between Wellington and Paramata. Timetabled services began several days later on the 24th.
The station originally only had a single side platform, with the present-day second side platform and shelter being added at a later date. The points were manually controlled from a signal box at the southern end of the station into the 1960s, with this being one of the last such sections of the line before complete automation.〔
In 2009 the loop was lengthened towards Wellington and the southbound platform was replaced and extended. Then the northbound platform was replaced and extended to enable the new Matangi EMUs to be used on the line. Other upgrades included new platform lighting, seating, and signage.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Ngaio Railway Station」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.